Shuqaiq II IWPP
Project Details
| Offtaker | Project Company | Owner's Engineer | EPC |
![]() |
![]() |
![]() |
![]() |
- 212,000 m3/d Potable Water from Seawater + 850 MW Power
- Construction Cost $1,830 million USD
- Actual Commercial Operation Date for Desalination Unit - 28th May 2010
Desalination Technology
- Coagulation, Dual Media Gravity Filters, Cartridge Filters, Toyobo 1st Pass RO Membranes, Dow FilmTec 2nd Pass RO Membranes with Permeate recycle for boron removal, lime & CO2 remineralisation.
BryTech Solutions Services
BryTech Solutions provided the Owner's Engineer services for the desalination plant all the way through from concept design at the tender stage , detailed design, construction and commissioning. The services included review EPC drawings relating to detailed process design, including PFDs, P&IDs, piping arrangements (including hydraulic calcs), equipment drawings, layouts, pipe schedule, valve schedule, motor schedule, equipment list. In addition, BryTech Solutions provided support to the Owner during contractual disputes with the EPC Contractor, Supervision of the Contractor during commissioning and support to the Owner during the first year of operation.
Delivering Process Solutions to the Water Industry